MMT Whitby to Redcar Survey
- 2017-02-27
- By admin
- Posted in Hydrographic survey
Contracted by MMT AB to provide a Reports Coordinator for the MCA Whitby to Redcar Survey. Conducted as part of the ongoing Civil Hydrography Programme, the 603 square kilometre survey area is on the north east coast of England, extending from Redcar in the north to Robin Hood’s Bay in the south. The seabed topography is remarkably spectacular, with complex geological bedrock features across the site, and sandwave areas nearshore in the south. Two vessels were utilised during the project, with MV Icebeam surveying the deeper areas, and MV Seabeam concentrating on the shallows. The data was verified using Caris HIPS, with a Report of Survey submitted to the UK Hydrographic Office along with the processed data to enable Admiralty Chart revisions. High-resolution FM Geocoder backscatter data and seabed samples to support seabed classification have also been submitted.
Recent Posts
- BP Caspian Shallow Water Pipeline Inspection Survey 13/01/2020
- Equinor Nearshore Pipeline Inspection Survey Project 23/10/2019
- SSEN Pentland Firth HVAC Survey Project 14/09/2019
- Equinor Norpipe Nearshore Pipeline Inspection Survey Project 02/09/2019
- 4D Ocean Linne Crowlin and Loch Carron Survey 22/07/2019
Recent Comments
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- martin sharp on Marin Mätteknik Culver Sands to Flat Holm Survey
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- Arien Kampman on Marin Mätteknik Culver Sands to Flat Holm Survey
- Fred Colebrooke on Marin Mätteknik Lyme Bay – Natural England Survey
Archives
Categories
- Archaeology (3)
- Hydrographic survey (35)
- Other (12)
- Pipeline construction (11)
- Pipeline inspection (14)
- Renewables (8)
- Route survey (10)
- Topographic survey (1)
- UXO survey (6)